Manufactured by Reynolds Building Systems, Inc.205 Arlington Drive Greenville, PA 16125 724-646-3775This manual is copyrighted. Under the copyright
Step 8 Assemble Front Wall5. Cut a 4x8 siding panel in half and install the siding with the tongue edge on the left end. Thesiding will extend 3-1/2&q
Pre-cut” Wall Studs68-1/2" Wall Plate4. Install the other siding panels. Cutthe last panel to extend 3-1/2"beyond the wall frame.Step 9 Asse
4. Install (3) three pre-cut wall studs between (2) two 48" long 2x4s boards.Install the stud in the center of the wall frame.XXXXXXXX72" Wa
Siding Extends 3/4" Below PlateLAP Edge9. Repeat to assemble the another sidewall.LAP6. Position a 48" wide wall frame between (2) two 72&qu
Step 12 Set WallsLayout both beams for the spacing of the loft floor joists.The 'X' marks where the floor joist will be placed.Step 13 Layou
2. Use the beam as a reference to markwhere the floor joist will be placed.The 2x4 floor joist, when installed,will be aligned with the wall studs.Ste
2x4 HangerCover 'X' Marks on2x6 BeamsStep 15 Install Loft Floor JoistsStep 16 Install Loft FlooringInstall 72" long 2x4s between the f
1x4-8' Corner TrimSidewallBack and Front Walls1x4 72" Top TrimCut to Fit1x4 TrimStep 17 Install Wall TrimLoft Floorflush1. Install (2) two
Step 18 Set Rear and Front GablesWARNING: The gable ends are heavyand awkward. You'll need helpers to liftand set gables in place.1. Install the
3. Layout the truss spacing. Measure from the inside face of the 2x4 gable plate to mark thelocation of the first truss. The last truss space will be
When measurements are given for a boardlength or width, it is from the longest side.measure from hereTool ListHammer & Phillips ScrewdriverFraming
Straight EdgeMetal Truss HangerSoffit Board Flush With SidingTo prevent the nails from protrudingthought the bottom of the soffit board,do not nail at
Building Tip: Install ridge vent in lieu of shingles caps. Ridge vent provides ideal ventilation,preventing heat and moisture from damaging your buil
Step 23 Install Front Gable Overhang1. With a helper install (2) two 61" and (2) two 42-1/2"long 2x3s against the roof sheathing, screw the
Frame Optional Walk-in Door Opening1x6 Pine Jamb1x4 Door TrimFront Wall34-1/2"door opening80-1/2" HaderSupports2x4 Header2. Install (2) two
Roof Covering: 12 bundle shingles - 8 pcs. roof edge - optional felt paper 1 rollTahoe 12'x 16' Packing ListQty. Qty.12 Wall Plates 72 "
Optional Wood Floor System6. Cut all the 2x4-12' boards to 11'-9". These boards will be the floor joist. Treated lumbermay be thicker t
Notes To Floor8. Square the floor. See note below. The angle measurement should be 20' - 0". Nail severalfloor joist to the 4x4 runners to h
2x6 Beam16"16"16"1-1/2" Space Both Ends4. To provide additional strength, install 2-1/2" wood screws spaced 16" apart as
Building Tip: To aid in the assembly of the trusses, temporarily screw 2x4 blocks tothe floor. There are short 2x4s, that may have an angle on one end
32-3/4"Step 4 Assemble Roof Gables1. Position (2) two truss halves together and secure the top with a 1"x4" barbed metal plate.2. Nail
61" Long 2x342-1/2" Long 2x334-3/4"RBlue endsRight doorhas Lap edgeRecut to20-3/4"Install SidingFlushInstall SidingFlush1. Remove
If installing the building on a cement slab cut the siding flush with the bottom plate.Square wall frame before installing siding. Measure diagonally