Manufactured by Reynolds Building Systems, Inc.205 Arlington Drive Greenville, PA 16125 724-646-3775This manual is copyrighted. Under the copyright
3. Install a 71-1/2" long 2x4 [red ends], asa header support, on each wall frame.71-1/2" HeaderSupport5. Install a 16" siding panel wi
3. Cut (2) two more 34-3/4" plates from 58-1/2" long2x4s and assemble another wall frame.19-3/4"Step 8 Assemble Door Wall - Doors Cente
Drawing shows a buildingwith the doors centered.2x4 Door HeaderStep 9 Set Walls1. Secure wall panels together at the corners. Use (4) four 10d coated
flush1. Install a gable on the rear wall. The gablesiding will extend over the 1x4 trim on thelower wall. NOT behind the trim!Secure gable to wall by
1. Install a 2x4-6' board over the sidewall,against the rear gable plate. Use 10dsinkers.SidewallStep 12 Install 2x4 Tie Plates2x4-6' Tie Pl
Inside of Building2x4 Tie PlateStep 13 Layout Roof Trusses1. Layout the truss spacing from the rear of the building. Measure from the inside of the 2x
Rear Gable3. Install soffit panels on theopposite side. Start with a24" long panel that has a'LAP' edge.Step 14 Set Roof TrussesSet roo
1x6 Fasciastraight edge22-1/2" Long 2x4w/ Beveled Edge1x6 - 7' Fascia Board48" x 72"48" x 48"48" LongPanel3. Instal
5. Locate (2) two 1x3-72" long trim boards. Tack these boards, with a couplenails, to each side of the door opening. You may want to move the tri
Step 18 Install Doors & Hardware4. Before you fasten the hinges to the doortrim, temporarily prop the doors in theopening. Leave a space at the to
When measurements are given for a boardlength or width, it is from the longest side.measure from hereIMPORTANT INFORMATION ABOUT YOUR SHED KITTool Lis
Material Packaged In Component KitInstall metal roof edge the perimeter of thebuilding. Install shingles according to theinstructions on the wrapper.
1. Cut (17) seventeen 2x4-12' treated boards to 11' 8-7/8". These will be the floor joists.2. Stagger the 4x4 timbers as shown below
Step 1 Assemble Trusses1. Screw (2) two 2x4 blocks to the 12' wide end of the floor at the corner, see below.2. Place two truss legs together. Po
Screw gable plate to trussleg with 2-1/2" screw.Step 2 Assemble Roof Gables1. Butt (2) two 72" long 2x4s together and secure by nailing a 3-
2. Install gable siding using 6d galv. nails acrossthe top of the gable frame. Use 8d galv. nailsalong the bottom edge. See Note Below. *Tongue EdgeLA
AABBXXXXXX2. Install 72" wall studs between the top and bottom plates. Assemble wall frames with10d sinkers, two (2) nails at each stud end. Nail
Step 5 Assemble 10' Long Sidewalls4. Cut one of the 48" wide siding panels in half lengthways.5. Square wall frame. Select one of the 2&apos
4. Repeat to apply siding to the other 10' wall frame.Step 6 Assemble Sidewalls for 20' Building Length1. Select one of the 10' sidewal