Manufactured by Reynolds Building Systems, Inc.205 Arlington Drive Greenville, PA 16125 724-646-3775This manual is copyrighted. Under the copyright
1. Install (3) three 7' wall studs between (2) two 48" long 2x4s boards. Install the middlestud in the center of the wall frame.2. Repeat to
2x4-7' Wall Studs19" Bottom Wall Plate3. Repeat to assemble another wall frame.Mark 'Right Frontwall'Mark 'Left Frontwall&apo
Left FrontwallStep 8 Set Walls4. Set wall panels. Secure at corners with 10d sinkers (4 nails per corner). Secure to floorwith 10 sinkers. Disassemble
Step 9 Install Door Jamb1. Install 48" long x 5-3/8" wide primed siding material on the top of the door opening.2. Install 83" long x 5
1. Install a gable on the rear wall. Secure gable to wall by nailing through thegable plate with 10d sinkers.Step 10 Install GablesSidewallStep 11 Ins
Inside of Building2x4 Tie PlateStep 12 Layout Roof Trusses1. Layout the truss spacing from the rear of the building. Measure from the inside of the re
Back WallBack GableStep 13 Set Roof TrussesRear GableSet roof trusses. Secure trusses to metalhangers with 1-1/2" hanger nails.Step 14 Install Ea
1. Cut (2) two 4x8 OSB panels into (2) two 4'x6 panels. Select the 2' wide pieces and cutthem to a length of 37-1/2".2. Cut (2) two 1x6
3. Cut 1x6-7' fascia boards to length and install onthe ends of the trusses, flush with the 2x4 boardsat the front of the building.5. Install 1x6
VIEW FROM INSIDEStep 17 Install 2x4 Around Door Jamb1. Install a 2x4 - 7' on the inside of the door opening to support the door track.2. Install
Tool ListHammer & Phillips ScrewdriverFraming Square & LevelCircular Saw and/or Hand SawPower Drill/ScrewdriverMeasuring Tape & Chalkline2
Vinyl Siding OverviewStep 18 Install Door Trim1. Install 1x4-84" trim boards along each sideof the door opening.2. Install (2) two 51-1/4" l
AirSpaceTrussShingles1x6 FasciaFeltPaper1x3 Gable TrimFrame Door Opening2. Install shingles according to the instructions on the wrapper. If you need
Material Packaged In Lumber KitMaterial Supplied by Local Supplier7 Collar Ties 2x4 90"24 Truss Rafters 2x4 86-1/4"37 Wall Studs 2x4 84"
Optional Wood Floor System6. Cut all the 2x4-12' boards to 11'-9". These boards will be the floor joist. Treated lumbermay be thicker t
Material Description 12' x 16' shed2x4 Treated 2 pcs. 8'2x4 Treated 17 pcs. 12'2x4 Treated 2 pcs. 16'4x4 Treated Runners 8 pc
Step 1 Assemble Trusses1. Screw (2) two 2x4 blocks to the 12' wide end of the floor at the corner, see below.2. Place two truss legs together. Po
Screw gable plate to trussleg with 2-1/2" screw.Step 2 Assemble Roof Gables1. Butt (2) two 72" long 2x4s together and secure by nailing a 3-
2. Repeat to install 2x4s on the another gable frame.5. Repeat to side another gable.Siding From KitStep 3A Install Siding on Gables1. Select one of t
AABBXXXXXX2. Install 7' wall studs between the top and bottom plates. Assemble wall frames with 10dsinkers, two (2) nails at each stud end. Nail
XXXXXXXX72" Wall PlateXXXXXXXXSiding 1/2" BelowTop Plate2x4-7' Wall StudsIf you are installing the optional walk-in door see the instru