Manufactured by Reynolds Building Systems, Inc.205 Arlington Drive Greenville, PA 16125 724-646-3775This manual is copyrighted. Under the copyright
5. Butt a 12' wall frame, from Step 5, against the 12' wall panel from Step 6.12' Wall Panelfrom Step 67. Separate these walls and rep
2x4-7' Wall Studs19" Bottom Wall Plate3. Repeat to assemble another wall frame.Mark 'Right Frontwall'Mark 'Left Frontwall&apo
Step 8 Set Walls2x4 Wall Brace12' SidewallNail Siding PanelsWhere They OverlapLeft Frontwall1. Set wall panels. Secure at corners with 10d sinker
SideWallFlush AcrossTop Plate1x4 Trim87-3/4" Long 1x4 Corner Trim1. Install 87-3/4" long 1x4 corner trim boards to the rear wall. Install tr
1. Install a gable on the rear wall. The gable siding will extend over the 1x4 trimon the lower wall. NOT behind the trim!Secure gable to wall by nail
Step 12 Install 2x4 Tie Plates2x4-6' Tie Plates2x4-6' Tie Plates3. Install (2) two more 2x4-6' boards.4 Cut the 3' long 2x4 cutoff
Inside of Building2x4 Tie PlateStep 13 Layout Roof Trusses1. Layout the truss spacing from the rear of the building. Measure from the inside of the re
3. Install soffit panels on theopposite side. Start with a24" long panel that has a'LAP' edge.Step 14 Set Roof TrussesRear GableStep 15
SOFFIT BLOCK DETAILWhen installing 1x6 fascia, next step, it will be necessary to install 22-1/2" long 2x4blocks between trusses where the fascia
3. Install (2) two 1x6-7' fascia boards in the center of the building.Step 16 Install 1x6 Fascia & Roof Sheathing Continued2. Install roof sh
Tool ListHammer & Phillips ScrewdriverFraming Square & LevelCircular Saw and/or Hand SawPower Drill/ScrewdriverMeasuring Tape & Chalkline2
Step 17 Install Front SoffitSoffit Panels1x6 Gable TrimIf you ordered the optional floor, install thegalvanized door sill. Secure sill with panhead sc
VIEW FROM INSIDEStep 18 Install 2x4 Around Door JambPrime Door Jamb2x4-7'51-1/2" Long 2x41. Install a 2x4 - 7' on the inside of the doo
AirSpaceTrussShingles1x6 FasciaFeltPaper1x3 Gable TrimFrame Door OpeningOSB Filler37-1/2" Long 2x42. Install shingles according to the instructio
Material Packaged In Lumber Kit7 Collar Ties 2x4 90"22 Truss Rafters 2x4 86-1/4"35 Wall Studs 2x4 84"2 Double Studs 2x4 84"18 Wall
Material Packaged In Siding & Roof Sheathing KitRoof Covering - not supplied in kit14 bdl. Roof Shingles10 pcs. Roof 'drip' Edge 10&ap
Material Description 12' x 24' shed2x4 Treated 2 pcs. 8'2x4 Treated 30 pcs. 12'4x4 Treated Runners 8 pcs. 12'Flooring 3/4
Notes To Floor4x84x84x84x4It is important that the floor be level and square. Squarethe floor as follows: before nailing the flooring, measurethe floo
Step 1 Assemble Trusses1. Screw (2) two 2x4 blocks to the 12' wide end of the floor at the corner, see below.2. Place two truss legs together. Po
Screw gable plate to trussleg with 2-1/2" screw.Step 2 Assemble Roof Gables1. Butt (2) two 72" long 2x4s together and secure by nailing a 3-
2. Install gable siding using 6d galv. nails acrossthe top of the gable frame. Use 8d galv. nailsalong the bottom edge.B3. Install siding on the other
AABBXXXXXX2. Install 7' wall studs between the top and bottom plates. Assemble wall frames with10d sinkers, two (2) nails at each stud end. Nail
XXXXXXXXXXXXXXXXSiding 1/2" BelowTop PlateStep 5 Assemble 12' Sidewalls Frames1. Square wall frame.2. Install the first siding panel with th